It doesn't not happen terribly infrequently, but we've been working.
The visible rubble, plus some that was used as fill underneath, and the block outer walls, amounted to twenty pick-up truck loads up to a private landfill near here. At a 4.8 mile round trip, it amounted to a cool 96 mile effort, and broke up the work nicely.
Throughout which, the neighbor up the hill kindly loaned us his John Deere tractor with its front loader, and we used it to alternately dump concrete in the truck and to cart all the de-rubble-ized clay-ish dirt over to the side yard where it now sprouts lawn.
And then there several fruitful days spent with the post hole digger, one of which ended badly, as previously told.
And then the pouring of the concrete began, which made everyone happy.
Two of the eight piers have been poured in the one above.
And finally…
We put twenty nine bags, or 2,320 lbs of concrete (plus water), in the ground, and almost the best thing was that there were no bags left over.
End phase IV.
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 | ||||||