While the lake is down, and the weather warming nicely, it’s time to shore up the ramparts and rebuild the crumbling infrastructure.

That’s the East end of the lake side of things. To the left, the neighbor (you remember the neighbor) allowed his block wall to fall into the lake some time ago (before we bought the place), and when it went it took the end of our wall with it, and left the part that didn’t fall slightly twisted. He did nothing to clean any of it up. On our wall, the loose blocks are piled on top to keep tiny Noggs from escaping in pursuit of various waterfowl. The wooden boardwalk, which runs for about twenty five feet until it hits the main dock, is old and unsafe to walk on, and needs to be replaced.
It appears that the lake bottom has eroded away from the old pilings, and from under the wall. I’m not sure if our entire finger has gotten deeper or whether the edges have merely silted in toward the middle. In any event, we’re going to jam more concrete everywhere we can. After all, Sweet Cheeks gave me a cement mixer for Christmas.

There’s four hours of not terribly difficult work, yesterday. Had some trouble with the stack of blocks that had rebar running through it, all cemented nicely in, but eventually I wrestled it out of there. The first section of boardwalk came down with very little trouble, and will go up in smoke tomorrow.
Today I came home from Lowes with ten concrete blocks, another eight sacks of concrete mix (to add to the eight I already laid by), 120 pounds of mortar mix, some 4 x 4s, 2 x 10s, 2 x 4s, and some more rebar. Plywood scraps and other necessities are already part of the general store. Tomorrow I build a small form or two, and we fire up that mixer.
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 | ||||||