Apropos my previous post, I was at it. The good news is that I think my long suffering back may have clicked back into place. I recommend throwing one’s legs to the left, one’s torso to the right, and trying to sit up in a space that won’t permit it. The bad news: my knees are bloody stumps, and I have another day o’ work on them.
But the hard part is done.
I spliced a couple valves into an easily accessible location to facilitate whole house shutoff. I snipped the kitchen piping out of the loop and capped the loop off, thereby maintaining water to the bathrooms and laundry room. Removed the lines from under the sink all the way down to the main snarl, including a spur that took hot water to an outside spigot (which was always one of the WTFs around here.) The spigot, never used, is now removed. Sweet Cheeks will fill and paint the hole.
Then a bright idea took hold, and I realized the new piping could take a short cut to the kitchen. But I was out of pipe almost before I started, got one wrong part yesterday, needed another can o’ glue, etc., so we piled in the truck for sixty feet more pipe, and all the other stuff.
Put a new two by four support under the sink, drilled holes through the crawlspace wall, ran pipe, added them sink valves, new flex lines, and then turned to the dishwasher. The way it had been hooked up was, um, sort of… improvised, and it took some doing to un-improvise it, but Sweet Cheeks on one end of the monkey wrench and me likewise with the channel locks did the trick. New line went right in.
Now I just need to tie into the main line, and the ends of the pipes are almost perfectly aligned, but it’s gonna wait until tomorrow. Plain measuring, cutting and gluing is easy.
What’s for dinner?
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 | ||||||