I've been remiss. But almost busy. Work started back in June. I meant to blog it all along.
I was delayed in my constructive efforts for nine days, as the 2 X 6 X 8 foot studs that Christmas Lumber tried to send me were unsuitable for the job. I ordered 130 of them. The first pile they sent, I pulled boards off down four levels, and couldn't find a decent one. Bark on every one, and splits and the like. I failed to take a picture of either batch, but I sent both offerings back. The second batch was no better than the first, even after my pointed complaints. Most of the rest of the lumber they sent was fine. I ended up buying the studs at Lowe's, and they were, if anything, better than I expected. Out of the sixty some that I've handled so far, I've tossed aside only three as unusable. They cost a little more.
Strangely, I still have no idea who is going to provide the metal roof for me to install on this thing. I have a lead on a guy a few miles up the road…
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 | ||||||