The forty seven trusses (some no bigger than a window) for the hip roof (with secret built in attic) were dumped off by Christmas Lumber at 4:00 p.m. Monday, and we had 'em all up by about 5:00 p.m. today (Wednesday). Afternoon temps in the 90s, still, here in the big TN. What a work out. The backs of our necks are sunburnt, for sure.

That's yours truly, Kathy's son Tom, and Sweet Cheeks herself, who played part time tool facilitator and small truss fetcher. I worked the lower truss regions while Tom performed all the higher level acrobatics. He's a good kid. (Special thanks to his sweetie Daniela who did without him for much of the last two days.)
Somewhere in there was passed the 5,000 nails mark.
There is still some piddling work around the edges, and then: Onward and upward to the roof, after which it's all melodramatic.
I've been remiss. But almost busy. Work started back in June. I meant to blog it all along.
I was delayed in my constructive efforts for nine days, as the 2 X 6 X 8 foot studs that Christmas Lumber tried to send me were unsuitable for the job. I ordered 130 of them. The first pile they sent, I pulled boards off down four levels, and couldn't find a decent one. Bark on every one, and splits and the like. I failed to take a picture of either batch, but I sent both offerings back. The second batch was no better than the first, even after my pointed complaints. Most of the rest of the lumber they sent was fine. I ended up buying the studs at Lowe's, and they were, if anything, better than I expected. Out of the sixty some that I've handled so far, I've tossed aside only three as unusable. They cost a little more.
Strangely, I still have no idea who is going to provide the metal roof for me to install on this thing. I have a lead on a guy a few miles up the road…
It's been a while since I made any porch posts, but we've been making real progress. As in 99.5% of the way there.

That's the "before" picture, taken more than two years ago (it's the only picture of that thing in my pile.) The cracks in the concrete floor, barely visible in the shot at the front edge, widened and deepened as time went on, and the sag, also visible under the door, worsened. Every time it rained, water pooled in the center. Terrible, terrible. Plus, no railings.
Ta daaaa…

Today. The final push was slowed when rain and cold interfered with the painting schedule, but things cleared up a couple days ago, and Sweet Cheeks came through with her flying roller. She even had to RE-paint about 200 of the pieces after we decided that the first color was all wrong. Too pink. All in all, there are something like 412 pieces in the columns and rails, not counting the spindles (of which there are 86, being the only items not made by me.)

Nice lines. Nice foot.

Still need to sand and seal the half step and the main steps. Wire up the electrical box. And then rout and nail a couple three four pieces of half round here and there, and it's DONE.
The design for the posts and rails came from the web page here, which I stumbled upon a year or so ago. I followed the specs almost exactly, except for the spindles, and for using pine instead of cedar.
To never insist on slicing up my own tongue and groove flooring, again. Especially in oak. I suppose it's a chore that every aspiring carpenter should undertake at least once, but for my money, once is enough.
The job I predicted would take "a long day", took a long week, and maybe then some, with breaks. The thumb on my left hand has gone numb from holding planks to the saw top. I've met my yearly quota in splinters, and have a jump on next year. And I think I put some wear on my dado set.

There's maybe eighty boards (bottom side up in the picture), which of course were sliced out of wider planks. Each board then took two passes through the saw for the groove, and two for the tongue. Forty five of the boards were given an additional two passes after I decided their grooves needed to be a few hundredths wider.
And it was slow work. Ripping the boards challenged the ShopSmith motor and went very slowly. I think I need a new blade there, too, but the machine has an outsized arbor, and I didn't have time to order a new blade, and probably don't want to continue to pay the premium involved. There are alternatives.
Cutting the grooves was the fastest. Minimum dado width, and the second pass was quick and easy. The challenge there was holding the boards to the fence and down against the table. The tongues were easier in that respect, but slower, overall. Finishing the tongues today, I calculated I was pushing about half an inch a second. With each board north of 120 inches, that's more than eight minutes per tongue, not including the time to walk around the saw, unclog the vacuum port, flip the board, carry it back, and start it through again. That's more than eleven hours just on the tongues.
But it will be glorious, no? Barring all the unforeseen difficulties still to come.
It was in the fifties for a couple of days, and then mid-sixties today. Kind of scary.
The porch is finally starting to look like something. The real hard work is done, with only a medium stretch of repetitive but fun stuff left to do.

That's Sweetcheeks moderating the discrepancies in the overlapping joists. Not only does modern lumber vary greatly in all its particulars, but we tried to put a slight bend in the entire porch to aid in the shedding of water, which required a little extra shaving of the timbers in the overlap areas. Now the flooring should go on without any large humps in it.
The dear girl is using my dad's old Stanley Handyman jack plane, which is about as old as I am. It's been in my possession for years, unused. Last week I took it apart for the first time, and worked the iron on a set of diamond stones for a couple of hours, at least. While I didn't quite grind past all the flaws that earlier years of free hand sharpening had marked in it, a decent edge was put most of the way across. Shavings flew.
(I forgot! From earlier today, who knows what the following is about: "How many patent dates are cast into the bed behind the frog (toward the tote)?" Give up? That's the first question of an interactive flow chart for help in identifying age and model of the old Stanley bench planes. Didn't really help me, but the question is a winner.)

And there we are, late this afternoon. Everything done in preparation for the flooring. Tomorrow we clean up the accumulated equipment mess, cart the last of the rubble up to the landfill, the garbage to the dump, and then rearrange the big saws in preparation for a long day of turning the pile of rough oak in the carport into 180 square feet of tongue and groove floor boards.
And then after the floor is on, there's the cladding (probably cedar) for the posts, and the railings, the stairs, and a new step to the front door (and let's not forget to run a wire through the foundation some time before then so we can have a little electricity out there, eh?)
Might be done by Christmas.
Previous porch work here.
It doesn't not happen terribly infrequently, but we've been working.
The visible rubble, plus some that was used as fill underneath, and the block outer walls, amounted to twenty pick-up truck loads up to a private landfill near here. At a 4.8 mile round trip, it amounted to a cool 96 mile effort, and broke up the work nicely.
Throughout which, the neighbor up the hill kindly loaned us his John Deere tractor with its front loader, and we used it to alternately dump concrete in the truck and to cart all the de-rubble-ized clay-ish dirt over to the side yard where it now sprouts lawn.
And then there several fruitful days spent with the post hole digger, one of which ended badly, as previously told.
And then the pouring of the concrete began, which made everyone happy.
Two of the eight piers have been poured in the one above.
And finally…
We put twenty nine bags, or 2,320 lbs of concrete (plus water), in the ground, and almost the best thing was that there were no bags left over.
End phase IV.
In the nick of time, I got off my duff and scratched together a Peterson's Bluebird house. According to specs, sort of, as I find fault with the ubiquitous diagram. With the determining angle at 63 degrees, the 14 3/8 inches on the opposite side should be dropped to about 14 1/8, with a corresponding cut to about 17 1/16 on the hypotenuse side measure. It all works very nicely then.
I noticed the Bluebirds out there two days ago, and again yesterday, and stood around with the camera awhile waiting for them to come back. The male is making a pretty good case for the place, but I'm not sure the female is interested. I haven't seen either of them go all the way in, yet, though the house is not located where I see it frequently.
The location is otherwise also not entirely ideal, as the support post may be too close to the boat I'm about to start sanding the bottom of, but maybe it will be okay. When I get even more organized (next year), I'll put a post further out in the side yard. In the meantime, I shall be respectful of things, insofar as I'm able.
Also, I think I'll build a little jig or two, so I can pump these houses out at high speed. Once the cuts are more or less automated, the pieces are a snap to snap together. And then it's Bluebird houses for the masses!
So far. But there were plenty of reasons it could have gone the other way.
Got the fire going late, so the brisket wasn't in the smoker until 9:45 a.m., which, anticipating twelve or more hours cooking meant a long stretch after dark. At the same time, Sweet Cheeks and I were trying to get the kitchen to the 98.5% done mark, meaning we had to install the stainless sink into the counter, add the faucets, re-create all the supply and waste plumbing under the sink, and figure out how to install the new dishwasher, too.
At one point, we were both on our backs, heads and shoulders under the sink, each trying to tighten little tiny nuts on the sink clips, feet sticking out into the kitchen, laughing our heads off. Someone should have gotten a picture.
Had a little trouble locking the new disposer in place, but the big channel locks finally managed it. Had to wire the thing twice, too, when the wire hanging out of the hole in the back wall proved to be about an inch short.
A couple three times in there I completely neglected to feed the fire on the smoker, which meant the temperature dropped to under 200 degrees, and of course I over compensated with more charcoal and hickory, so the temps then swung too high, like up to maybe 275. And there really wasn't enough room in there after I added three slabs of ribs about 11:00 a.m., so the slab that was closest to the fire got a little black on the bottom, but finished up early and was promptly eaten when it was brought inside the house.
And then while I fiddled with assorted plastic tubes, trying to connect disposers and drains and such, Sweet Cheeks took a look at the dishwasher drain line, and determined that we still didn't have the right piece, so she started calling Lowe's and got hung up on about four times, which likely has resulted in one or two people getting in trouble. At one point, she called Frigidaire to see what size drain line we really needed, since that's the kind of new dishwasher (bought at Lowe's) that we were trying to install, and Frigidaire said, "What happened to the drain line that came WITH your dishwasher?" Another call to Lowe's and that idiot said that if we didn't have the line, then Lowe's didn't have the line, and that's all there was to it. Click. Sweet Cheeks called right back, got the store Sales Manager on the line, and in about twenty seconds that guy had someone fetching a line from an unsold dishwasher and putting it aside for us. One of our neighbors brought it home for us, which made an interesting saga out of the thing.
And then I glued up the ABS waste pipe, wired up the dishwasher, had a couple glitches here and there, hooked up the supply lines with only mild troubles, pulled more ribs out of the heat, ate a bunch, kept the fire going for the brisket, and finally turned the water to the kitchen back on.
Well, we had a couple leaks, one of them Sweet Cheeks fixed just by tightening a nut, but the other one wasn't cooperative, and I think it's the threads on the little chrome shutoff valve. Will have to let it go until tomorrow.
But we've already repopulated the kitchen with most of the stuff and we're almost there. After I get the cold water working, then it's just a few baseboards and some other trim, a little caulking, and Yaaaaaaaaay!
So, after all that, I stuck a thermometer in the brisket, got a solid 180 degrees, let it go another half hour as I said I'd do last time, and I think I nailed it. There are some crispy parts, but mostly not, and the thing is falling apart delicious. Mmmmmmmm, fabulous. Oh, and the nine and a half pound brisket was only in the heat for about eleven hours, so I think I was running it a little hot today, after all was said and done. Can't say that I'll be able to refer back to it later as an informative data set with all the distraction happening around it, but there it is, as it happened.
Have the pols lowered the cost of health care, yet? I’ve been contemplating offering bets of $500 or a $1000 that health care costs won’t be any lower in ten years than they are now (absent a complete collapse of economy and government), so if anyone is interested, drop me a line and I’ll figure out a way to weasel out of it.
Today was a day. When I went to bed last night, the lake water was a little high, but not anything to worry about, after a couple solid days of rain. I woke up to find the water had risen over the dock, with the sailboat in danger of bumping the bottom of itself where no bumper could protect it. I cut the electricity to the dock, sloshed through the shallows in my sandals (the water wasn’t too bad, though the air was about fifty degrees), and deployed anchors to hold the boat off that which it is usually beside. We kept an eye on the neighbor’s pontoon boat, as its canopy got closer and closer to the roof rafters above it. The waters have yet to recede more than an inch or two, and may actually rise again over night. The TVA is playing with the people’s generators down at the dam.
And then we tore the kitchen apart. We’re doing it methodically, don’t you know. Some cabinets are gone from one end. Some floor is ripped up. Tomorrow a four by eight goes down, and then some more stuff gets ripped out, etc. Still need to buy insulation and some quality snap together mostly wood flooring. And some more two by sixes. New cabinets arrive next Wednesday. It’ll be tight.
I also spent some quality time on the roof, where the view really is stupendous, trying to ferret out the newest rainwater entry point, not having much luck. I put down a strip of that lovely peel n’ stick aluminum adhesive backed stuff* (You’d know the brand name in a heartbeat, but I don’t want to attract the attention of the fucking morons at the FTC) in a semi-likely spot, but will certainly have to pursue the matter further on some other day. Must purchase bucket o’ tar, tomorrow, check.
In bird news, I didn’t see the Black-crowned Night Heron today because the dock it has taken to was under water all day, but it’s been on that dock every other day this week, where it catches and swallows fish after fish.
And that’s the way it is, whatever day it is.
XOXOXXO
*It’s Peel & Seal Self-Stick Aluminum Roll Roofing, and no homeowner should be without some.
It’s plumb duh. Eighty some feet o’ pipe. Eight new valves. Etc. Etc. My thighs are killing me. Only thing I can figger is that crawling is good exercise.
The Three Stooges plumbing is gone, though some of it was so intricately entwined with other structures that it had to be left in place as a sort of shrine to incompetence and laziness. Just before finishing I found other piping that someone else had previously left in place as a shrine to earlier plumbing hijinks.
Tomorrow I can go looking for that soft spot in the floor that started this mess four days ago.
Apropos my previous post, I was at it. The good news is that I think my long suffering back may have clicked back into place. I recommend throwing one’s legs to the left, one’s torso to the right, and trying to sit up in a space that won’t permit it. The bad news: my knees are bloody stumps, and I have another day o’ work on them.
But the hard part is done.
I spliced a couple valves into an easily accessible location to facilitate whole house shutoff. I snipped the kitchen piping out of the loop and capped the loop off, thereby maintaining water to the bathrooms and laundry room. Removed the lines from under the sink all the way down to the main snarl, including a spur that took hot water to an outside spigot (which was always one of the WTFs around here.) The spigot, never used, is now removed. Sweet Cheeks will fill and paint the hole.
Then a bright idea took hold, and I realized the new piping could take a short cut to the kitchen. But I was out of pipe almost before I started, got one wrong part yesterday, needed another can o’ glue, etc., so we piled in the truck for sixty feet more pipe, and all the other stuff.
Put a new two by four support under the sink, drilled holes through the crawlspace wall, ran pipe, added them sink valves, new flex lines, and then turned to the dishwasher. The way it had been hooked up was, um, sort of… improvised, and it took some doing to un-improvise it, but Sweet Cheeks on one end of the monkey wrench and me likewise with the channel locks did the trick. New line went right in.
Now I just need to tie into the main line, and the ends of the pipes are almost perfectly aligned, but it’s gonna wait until tomorrow. Plain measuring, cutting and gluing is easy.
What’s for dinner?
Yesterday was one of those days, in certain respects, and today promises to be even more of the same.
It’s never good to find a soft spot in the floor, and when it’s found right where one stands when using the kitchen sink, there’s bound to be trouble of more than one nature. And so it was.
I crawled under the house, and immediately found water where there had been none before. The steady drip of clean, cool water reached my ears, when it shouldn’t have.
Back topside, Sweet Cheeks filled a storage box with the things from under the sink, we pried the boards out, marveled at the junk the previous slob owners had covered up, wailed and gnashed in dismay, and pondered the eventualities.
In a year and a half, I’d become fairly familiar with the setup down below, and I knew it wasn’t going to be fun. The new leak is in a type of pipe that has been pulled from the market, and in this house is only used to feed the kitchen. I’d repaired that line in another spot early this year, but noticed that it, too, was starting to leak again. There are at least two other small leaks in the system. So, the decision was made: It would have to be a wholesale repair. Part of the reason is stuff like this:

One can lay on one’s back under the house and stare at that stuff for quite some time before one groks exactly where the water goes. Note the electrical wires swimming their way through. And that’s only part of it. And there are no valves for shutting off one portion or another of the house.
So, I’m going in. I bought a pair of those PVC nippers, and they work really swell. No more sawing. I’ve got pipe hangers, valves, caps, tees, elbows (two kinds), primer, glue, more pipe, sink valves, and a new dishwasher supply line. Wish me luck.
And if anyone thinks that the plumbing pictured there is a good argument for state building codes, inspections, permits, and the rest of the fucking collectivist rot, understand this: The person responsible for that piping and electrical work is a licensed contractor in the state of Tennessee. And that’s the work he did on his own home.
I’m going to fix it.
And then, judging by the sites Sweet Cheeks has been surfing, we’re going to rip out the cabinets and floor, and rebuild the kitchen from the bottom up. Yikes.
The wind indicator disappeared off Weave’s mast sometime over the winter, and how to get a new one installed absorbed quite a chunk of my drifting-off-to-sleep thought cycles over the early part of the year. The local sailboat jockeys across the lake want $69.95 an hour to perform even the littlest of chores. Loosen one nut, and tighten a new one? Forget about it. But how to get up there?
To make a long story short:

Nope, that twenty four foot extension ladder is not leaning against the mast, though I sure did have my arm wrapped through and around both of them, but I pulled the mast over to me when I got up there.
I was all psyched out for it, but I started up that contraption, got about to the level of the dock roof, and panic set in. I looked up to where I had to go and my heart sank. So I sat on the roof, and Sweet Cheeks wandered off to let me search my soul at my own speed, and about a minute later I put the fears behind me and climbed up like nothing. It wasn’t so bad. I went up twice, got the indicator installed with no problems, and checked out everything aloft while I was at it.
The thing really was rock solid. Moreso than putting the same ladder up against a gutter on the house and climbing it. First, I bolted the ladder’s feet to the dock. Then I ran two stout lines from the second rung down back over the roof of the dock in an acute ‘V’, tying one to a cleat and the other to a tree, and they controlled how far the ladder leaned out toward the boat. About five rungs down I tied another pair of lines to restrict any sideways movement, which also added the benefit of keeping the ladder from falling backwards. And that was it.
I figure I’ll be able to use a modification of the setup in the fall to hoist the mast out of the boat, so I can trailer the thing for to work on (paint) at my leisure.
Relatedly, an American Spectator piece, titled A Ladder to Nowhere, on the economic idiocies from which our elected officials dangle.

Just back last night from five days and nights of cleaning, sorting, picking, choosing, filling bags and boxes, and hauling a sizeable chunk of it to the curb. That’s the end pile there, with Sweet Cheeks juxtaposed for scale.
And that’s only a little more than half of it. A lot of stuff didn’t last five minutes at the curb. Scavenging has gone main stream, we deem. A regular parade of men, women, youth, geriatrics, day and night, helped themselves to the pile, and none of them made the least bit of mess. We wuz impressed. Felt sorry for the lady who said that she might want the end table that we’d just hauled out, went for her car to put it in, only to find the thing gone in the four minutes it took her to get back.
People took TVs, working or not, but let the broken computer monitor sit for four days. Lamps and fans were quickly gone. A giant Steelcase desk disappeared in short order, most likely for scrap. The big wooden desk that cost me ten dollars about twenty years ago sat untouched. Boxes of art education books went quickly, but the two boxes of Readers Digest condensed books that I’ve been hauling around for twenty five years (and never saw one of them cracked open, least of all by me) ended up in the Friday morning dumptruck. One bookcase got snatched, but the other one didn’t. Even various homemade (before my skills improved) pieces were also hauled off by the local amateurs.
That big gash in the side of the rain-soaked box springs was put there about eight and a half years ago when a youngish Ursula managed to crawl into one end of the assembly and, unable to turn around, kept going forward. I was on the computer, about four feet away when I heard the strangest noises behind me. It took me maybe twenty seconds to figure out where she was. How to get her out wasn’t easy. I had to take the mattress away without crushing her, and then cut the fabric back off the springs frame. The damn cat was jammed deep in the springs, about two feet in from the head, and a foot from the side. It was an interesting sight, and I contemplated the photographic potential, but decided there was no time to fool around. Fortunately, I’d purchased a pair of linesman’s pliers a couple weeks earlier, but they were out in the garage, so I ran for them, snatching other cutting implements on the fly. She was in the same spot when I got back, and I immediately started hacking away at the wires and coils. She seemed to fully understand what it was I was trying to do for her and when I was finally able to pull the sharp edges of the cut wires far enough apart, she crawled herself out. I shudder to think how it might have ended if I hadn’t been there when she first crawled in.
Here’s how she looked directly afterwards:

At this remove, I can’t recall whose blood that is on her face and paws, but no serious injuries were sustained by either party.
Later, I wrapped the springs in a large bedspread to prevent further access, and with the mattress back on top, no one could tell a thing, and since the bed served mainly as a horizontal filing cabinet any potential loss of springiness was inconsequential.
The house in WV is still for sale, by the way, if anyone is interested. Now, it’s much cleaner. Also, I boarded up the crawlspace accesses whereby the (possibly a ground hog or possum, but probably a) raccoon was inviting itself to sample the kitchen’s once vast stores of granola bars. Spurious rumors of a skunk in the old pile of dead limbs to the side remain spurious rumors. Also, I plugged the hole in the eaves and removed the dead pigeon from the attic. The ghost has remained unseen and unsensed since mid-1994.
From the last month or so:
While the lake is down, and the weather warming nicely, it’s time to shore up the ramparts and rebuild the crumbling infrastructure.

That’s the East end of the lake side of things. To the left, the neighbor (you remember the neighbor) allowed his block wall to fall into the lake some time ago (before we bought the place), and when it went it took the end of our wall with it, and left the part that didn’t fall slightly twisted. He did nothing to clean any of it up. On our wall, the loose blocks are piled on top to keep tiny Noggs from escaping in pursuit of various waterfowl. The wooden boardwalk, which runs for about twenty five feet until it hits the main dock, is old and unsafe to walk on, and needs to be replaced.
It appears that the lake bottom has eroded away from the old pilings, and from under the wall. I’m not sure if our entire finger has gotten deeper or whether the edges have merely silted in toward the middle. In any event, we’re going to jam more concrete everywhere we can. After all, Sweet Cheeks gave me a cement mixer for Christmas.

There’s four hours of not terribly difficult work, yesterday. Had some trouble with the stack of blocks that had rebar running through it, all cemented nicely in, but eventually I wrestled it out of there. The first section of boardwalk came down with very little trouble, and will go up in smoke tomorrow.
Today I came home from Lowes with ten concrete blocks, another eight sacks of concrete mix (to add to the eight I already laid by), 120 pounds of mortar mix, some 4 x 4s, 2 x 10s, 2 x 4s, and some more rebar. Plywood scraps and other necessities are already part of the general store. Tomorrow I build a small form or two, and we fire up that mixer.
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 | ||||||